Client:
Watercare Services Limited
Location:
Snells and Algies Bay, Rodney

In commissioning a new WWTP in Snells Beach, our Client identified there was a high saline content in the wastewater from three pump stations in Snells Beach and Algies Bay that would affect the performance of the new WWTP.

The existing piped network lies within the marine reserve and are exposed to saltwater infiltration via the pipes and manhole chambers with the manholes submerged at high tide.

March Cato’s scope of works was to:

  • Carry out investigations (i.e. CCTV inspection of 748m of sewer pipe assets (DN225 and DN300 asbestos cement), 16 manholes and four wet wells)
  • Provide detailed design and construction of the following elements: Renewal of the existing sewer network pipes using a structural trenchless liner
  • Replacement of existing chambers with sealed chambers
  • Abandoning selected chambers
  • Rehabilitate selected existing chambers to prevent further infiltration of sea water
  • Carry out additional repairs identified from the investigations

 

As Head Contractor, March Cato’s work scope also included responsibility for all project planning and programming; engagement of specialist subcontractors; management of health and safety, environmental and quality; obtaining Watercare, Auckland Transport approvals and Resource Consent for working in the CMA; reviewing / checking of all captured data (i.e. CCTV footage and condition assessment rating) for accuracy and completeness prior to reporting / presenting to Watercare, design and build; stakeholder management, TTM, temporary works installation, design of manhole repair solutions including replacement, repair and sealing / upgrades, and reinstatement.

Relevance

  • Turnkey contractor: Demonstrates March Cato’s experience and capability in supporting clients to analyse and diagnose faults and issues, propose solutions and recommended repairs, manage a design process, acquire relevant approvals and then deliver the repairs required to meet our Client’s brief.
  • Expertise in Comprehensive Asset Renewal: Demonstrates March Cato’s extensive experience in managing similar large-scale wastewater network renewals.
  • Advanced Rehabilitation Techniques: Use of trenchless SWL technology, resulting in less disruption to affected stakeholders as well as being highly effective at the same time, aligning with Watercare’s focus on innovative and sustainable rehabilitation methods.
  • Stakeholder Engagement: Our proven ability to work effectively with Watercare’s Communication team in varied environments including residential areas and private backyards, showcasing our strong stakeholder management skills as well as our ability to develop innovative access solutions to minimise stakeholder impact.
  • Project Management: March Cato’s role in overseeing comprehensive project aspects from safety to compliance and environmental management will be relevant to the responsibilities required for the proposed projects.
  • Collaborative Approach: The collaborative asset assessment, planning and execution with Watercare highlights our ability to work effectively with our clients.
  • Specialised Contractor Integration: The use of specialised contractors for specific tasks underlines March Cato’s capability to seamlessly integrate specialised services to deliver broader project goals.
  • Experience with TTM and Temporary Works Management: Skills which will be critical for minimising disruption particularly during the rehabilitation work phase in urban settings.